Chandigarh lets architects self-certify plinth-level construction, ending mandatory site visits

A house under construction with brick walls and a mountain backdrop in India

Chandigarh has amended its building rules so that owners, or their architects, no longer have to wait for an Estate Office inspection once construction reaches the damp proof course (DPC) level, according to a report in Dainik Bhaskar.

The Chandigarh Building Rules (Amendment) Rules, 2026 were notified by the UT Estate Department on November 18 and came into force across the city with immediate effect.

Under the revised process, the owner or architect submits photographs of the work completed up to DPC level, along with a certificate confirming that construction matches the sanctioned building plan. Once the documents are filed, the DPC certificate will be treated as issued on a self-certification basis, without a mandatory site visit by officials.

The DPC stage, reached after the foundation and plinth masonry are complete, has so far required official verification before walls above plinth level could go up, often stalling work on site while owners waited for inspectors.

The administration has kept its oversight powers. The estate officer concerned can still order an inspection or verification at any stage if a violation is suspected.

The change places more responsibility on architects, whose certification now carries the weight of the approval, while removing a routine bottleneck for homeowners and builders in the city.

Featured image: Chirayu Vyas / Pexels

Leave a Reply

Your email address will not be published. Required fields are marked *